Maxprefabs designed, manufactured, shipped and installed 1.450 m2 prefabricated office building in Baku, Azerbaijan.
The prefabricated office building has been manufactured within 20 days and installed within 25 days all together. The prefabricated office building in Azerbaijan was produced in panelized system. By this way the prefabricated building fastly installed. Panelized system provides sound and heat advantages to the building.
The prefabricated panelized system is also provides advantage of economical solution for this kind of temporary purposes. The fast production and installation are also the other advantages of the panelized system of prefabricated buildings.
Our customer in Baku is using the prefabricated building as their office building for their staff.
COUNTRY
BAKU, AZERBAIJAN
CATEGORY
PREFABRICATED BUILDINGS
YEAR
2021
TOTAL AREA
1.450 M2