Maxprefabs has been completing the production and installation of 2.250 m2 prefabricated office and accomodation buildings in Basrah, Iraq. The project is composed by one office and two accomodation buildings. The prefabricated buildings in Iraq was produced by presed panel system. The project was manufactured and erected within 3 months only.
COUNTRY
BASRAH, IRAQ
CATEGORY
PREFABRICATED BUILDINGS
YEAR
2021
TOTAL AREA
2.250 M2